Delay and disruption in construction contracts /

Saved in:
Bibliographic Details
Edition:Fifth edition.
Imprint:Milton Park, Abingdon, Oxon ; New York, NY : Informa Law from Routledge, 2016.
©2016
Description:ciii, 1152 pages ; 26 cm.
Language:English
Series:Construction practice series
Construction practice series.
Subject:
Format: Print Book
URL for this record:http://pi.lib.uchicago.edu/1001/cat/bib/11039674
Related Items:Revision of: Delay and disruption in construction contracts.
Hidden Bibliographic Details
Other authors / contributors:Burr, Andrew editor.
ISBN:9781138940666 (hbk)
1138940666 (hbk)
Notes:Includes bibliographical references and index.

MARC

LEADER 00000cam a2200000 i 4500
001 11039674
003 ICU
005 20170620135803.1
008 150903t20162016enk b 001 0 eng
010 |a 2015033967 
019 |a 913768110  |a 946295383 
020 |a 9781138940666 (hbk) 
020 |a 1138940666 (hbk) 
035 |a (OCoLC)920683044  |z (OCoLC)913768110  |z (OCoLC)946295383 
040 |a DLC  |b eng  |e rda  |c DLC  |d YDXCP  |d BDX  |d BTCTA  |d OCLCF  |d UV0  |d CDX 
042 |a pcc 
043 |a e-uk-en 
050 0 0 |a XXK891.B8  |b D449 2016 
082 0 0 |a 343.07/862  |2 23 
090 |a XXK891.B8  |b D449 2016 
245 0 0 |a Delay and disruption in construction contracts /  |c Andrew Burr; with editorial assistance from Annabella Matute Castro. 
250 |a Fifth edition. 
264 1 |a Milton Park, Abingdon, Oxon ;  |a New York, NY :  |b Informa Law from Routledge,  |c 2016. 
264 |a ©2016 
300 |a ciii, 1152 pages ;  |c 26 cm. 
336 |a text  |b txt  |2 rdacontent  |0 http://id.loc.gov/vocabulary/contentTypes/txt 
337 |a unmediated  |b n  |2 rdamedia  |0 http://id.loc.gov/vocabulary/mediaTypes/n 
338 |a volume  |b nc  |2 rdacarrier  |0 http://id.loc.gov/vocabulary/carriers/nc 
490 1 |a Construction practice series 
504 |a Includes bibliographical references and index. 
505 0 |a Introduction and terminology -- The risk of development -- Project procurement -- Standard form provisions for time and cost -- Notices, claims and early warnings -- Extensions of time and time at large -- Planning and programming -- Presentation and approval of programmes -- Revising, updating, monitoring and reporting -- Project control -- Mitigation, recovery and acceleration -- Variation and change -- Construction records -- Cause and effect -- Forensic programme analysis -- Float and time contingencies -- Disruption to progress and lost productivity -- Concurrency, parallelism and pacing -- Total time, total loss and global claim -- Apportionment -- Damages -- Settlements and dispute resolution -- Adjudication in the united kingdom -- Dispute boards -- Mandatory laws in international construction contracts. 
650 0 |a Construction contracts.  |0 http://id.loc.gov/authorities/subjects/sh89001472 
650 0 |a Construction contracts  |z England.  |0 http://id.loc.gov/authorities/subjects/sh2009121610 
650 7 |a Construction contracts.  |2 fast  |0 (OCoLC)fst00875896 
651 7 |a England.  |2 fast  |0 (OCoLC)fst01219920 
700 1 |a Burr, Andrew  |e editor.  |0 http://id.loc.gov/authorities/names/n93101032  |1 http://viaf.org/viaf/224989382 
775 0 8 |i Revision of:  |a Pickavance, Keith.  |t Delay and disruption in construction contracts.  |b 4th ed.  |d London : Sweet & Maxwell ; LLP, 2010.  |z 9780414045200. 
830 0 |a Construction practice series. 
903 |a HeVa 
929 |a cat 
999 f f |i b7b4795a-d831-5e28-a98d-f4e3749f27a7  |s efabd6b8-2109-5c88-b333-198e088d51d1 
928 |t Library of Congress classification  |a XXK891.B8 D449 2016  |l DLL  |c DLL-Law  |i 9533051 
927 |t Library of Congress classification  |a XXK891.B8 D449 2016  |l DLL  |c DLL-Law  |b 74494267  |i 9781612