Delay and disruption in construction contracts /
Saved in:
Edition: | Fifth edition. |
---|---|
Imprint: | Milton Park, Abingdon, Oxon ; New York, NY : Informa Law from Routledge, 2016. ©2016 |
Description: | ciii, 1152 pages ; 26 cm. |
Language: | English |
Series: | Construction practice series Construction practice series. |
Subject: | |
Format: | Print Book |
URL for this record: | http://pi.lib.uchicago.edu/1001/cat/bib/11039674 |
Related Items: | Revision of:
Delay and disruption in construction contracts. |
MARC
LEADER | 00000cam a2200000 i 4500 | ||
---|---|---|---|
001 | 11039674 | ||
003 | ICU | ||
005 | 20170620135803.1 | ||
008 | 150903t20162016enk b 001 0 eng | ||
010 | |a 2015033967 | ||
019 | |a 913768110 |a 946295383 | ||
020 | |a 9781138940666 (hbk) | ||
020 | |a 1138940666 (hbk) | ||
035 | |a (OCoLC)920683044 |z (OCoLC)913768110 |z (OCoLC)946295383 | ||
040 | |a DLC |b eng |e rda |c DLC |d YDXCP |d BDX |d BTCTA |d OCLCF |d UV0 |d CDX | ||
042 | |a pcc | ||
043 | |a e-uk-en | ||
050 | 0 | 0 | |a XXK891.B8 |b D449 2016 |
082 | 0 | 0 | |a 343.07/862 |2 23 |
090 | |a XXK891.B8 |b D449 2016 | ||
245 | 0 | 0 | |a Delay and disruption in construction contracts / |c Andrew Burr; with editorial assistance from Annabella Matute Castro. |
250 | |a Fifth edition. | ||
264 | 1 | |a Milton Park, Abingdon, Oxon ; |a New York, NY : |b Informa Law from Routledge, |c 2016. | |
264 | |a ©2016 | ||
300 | |a ciii, 1152 pages ; |c 26 cm. | ||
336 | |a text |b txt |2 rdacontent |0 http://id.loc.gov/vocabulary/contentTypes/txt | ||
337 | |a unmediated |b n |2 rdamedia |0 http://id.loc.gov/vocabulary/mediaTypes/n | ||
338 | |a volume |b nc |2 rdacarrier |0 http://id.loc.gov/vocabulary/carriers/nc | ||
490 | 1 | |a Construction practice series | |
504 | |a Includes bibliographical references and index. | ||
505 | 0 | |a Introduction and terminology -- The risk of development -- Project procurement -- Standard form provisions for time and cost -- Notices, claims and early warnings -- Extensions of time and time at large -- Planning and programming -- Presentation and approval of programmes -- Revising, updating, monitoring and reporting -- Project control -- Mitigation, recovery and acceleration -- Variation and change -- Construction records -- Cause and effect -- Forensic programme analysis -- Float and time contingencies -- Disruption to progress and lost productivity -- Concurrency, parallelism and pacing -- Total time, total loss and global claim -- Apportionment -- Damages -- Settlements and dispute resolution -- Adjudication in the united kingdom -- Dispute boards -- Mandatory laws in international construction contracts. | |
650 | 0 | |a Construction contracts. |0 http://id.loc.gov/authorities/subjects/sh89001472 | |
650 | 0 | |a Construction contracts |z England. |0 http://id.loc.gov/authorities/subjects/sh2009121610 | |
650 | 7 | |a Construction contracts. |2 fast |0 (OCoLC)fst00875896 | |
651 | 7 | |a England. |2 fast |0 (OCoLC)fst01219920 | |
700 | 1 | |a Burr, Andrew |e editor. |0 http://id.loc.gov/authorities/names/n93101032 |1 http://viaf.org/viaf/224989382 | |
775 | 0 | 8 | |i Revision of: |a Pickavance, Keith. |t Delay and disruption in construction contracts. |b 4th ed. |d London : Sweet & Maxwell ; LLP, 2010. |z 9780414045200. |
830 | 0 | |a Construction practice series. | |
903 | |a HeVa | ||
929 | |a cat | ||
999 | f | f | |i b7b4795a-d831-5e28-a98d-f4e3749f27a7 |s efabd6b8-2109-5c88-b333-198e088d51d1 |
928 | |t Library of Congress classification |a XXK891.B8 D449 2016 |l DLL |c DLL-Law |i 9533051 | ||
927 | |t Library of Congress classification |a XXK891.B8 D449 2016 |l DLL |c DLL-Law |b 74494267 |i 9781612 |