Closeout costs, Clinch River breeder reactor project hearing before the Committee on Science and Technology, U.S. House of Representatives, Ninety-seventh Congress, first session, May 11, 1981.

Saved in:
Bibliographic Details
Corporate author / creator:United States. Congress. House. Committee on Science and Technology.
Imprint:Washington : U.S. G.P.O., 1981.
Description:iii, 321 p. : ill. ;
Language:English
Subject:
Format: E-Resource U.S. Federal Government Document Book
URL for this record:http://pi.lib.uchicago.edu/1001/cat/bib/10675030
Related Items:Print version: Closeout costs, Clinch River breeder reactor project
Hidden Bibliographic Details
Other uniform titles:ProQuest U.S. Congressional Hearings Digital Collection.
Notes:Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection. Reuse except for individual research requires license from ProQuest, LLC.
Includes bibliographical references.
Includes bibliographical references.
Electronic reproduction. [Bethesda, Md.] : ProQuest, 2004. digital, PDF file. ProQuest U.S. Congressional Hearings Digital Collection. Mode of access: World Wide Web via ProQuest website.
Other form:Print version: United States. Congress. House. Committee on Science and Technology. Closeout costs, Clinch River breeder reactor project
Microfiche version: United States. Congress. House. Committee on Science and Technology. Closeout costs, Clinch River breeder reactor project. [Bethesda, Md.] : ProQuest,[2004] CIS 82 H701-2
GPO item no.:1025-A-1, 1025-A-2 (microfiche)
Govt.docs classification:Y 4.Sci 2:97/30

MARC

LEADER 00000nam a22000001a 4500
001 10675030
006 m d f
007 cr bn mmmapmmp
008 100322s1981 dcua sb f000 0 eng d
003 ICU
040 |a UMI  |c UMI 
043 |a n-us-tn 
074 |a 1025-A-1, 1025-A-2 (microfiche) 
084 |a HRG-1981-TEC-0050 
086 0 |a Y 4.Sci 2:97/30 
088 |a No. 30 (United States. Congress. House. Committee on Science and Technology) 
110 1 |a United States.  |b Congress.  |b House.  |b Committee on Science and Technology. 
245 1 0 |a Closeout costs, Clinch River breeder reactor project  |h [electronic resource] :  |b hearing before the Committee on Science and Technology, U.S. House of Representatives, Ninety-seventh Congress, first session, May 11, 1981. 
260 |a Washington :  |b U.S. G.P.O.,  |c 1981. 
300 |a iii, 321 p. :  |b ill. ; 
500 |a Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection. Reuse except for individual research requires license from ProQuest, LLC. 
504 |a Includes bibliographical references. 
504 |a Includes bibliographical references. 
533 |a Electronic reproduction.  |b [Bethesda, Md.] :  |c ProQuest,  |d 2004.  |e digital, PDF file.  |n ProQuest U.S. Congressional Hearings Digital Collection.  |n Mode of access: World Wide Web via ProQuest website. 
650 0 |a Liquid metal fast breeder reactors. 
650 0 |a Nuclear power plants  |z Tennessee. 
730 0 |a ProQuest U.S. Congressional Hearings Digital Collection. 
776 0 8 |i Print version:   |a United States. Congress. House. Committee on Science and Technology.  |t Closeout costs, Clinch River breeder reactor project  |w (DLC)81603909  |w (OCoLC)08089417  |w gp 82006894 
776 0 8 |i Microfiche version:   |a United States. Congress. House. Committee on Science and Technology.  |t Closeout costs, Clinch River breeder reactor project.  |d [Bethesda, Md.] : ProQuest,[2004]  |o CIS 82 H701-2  |w (ProQuest)cis08201207 
856 4 0 |u http://congressional.proquest.com/congcomp/getdoc?HEARING-ID=HRG-1981-TEC-0050  |y ProQuest Congressional 
035 |a cis2007495134 
929 |a nox 
999 f f |i a898e926-0429-5f2f-8025-9a7ed766c1a0  |s d4fde0c9-8fc4-5add-9e78-e138cd20d80d 
928 |t Library of Congress classification  |l Online  |c UC-FullText  |u http://congressional.proquest.com/congcomp/getdoc?HEARING-ID=HRG-1981-TEC-0050  |z ProQuest Congressional  |g ebooks  |i 8857102