Central Arizona Project and Colorado River Water Rights hearings before the United States Senate Committee on Interior and Insular Affairs, Eighty-First Congress, first session, on Mar. 21-24, 26, 28-31, Apr. 2, 9, 11-14, 26-28, 30, May 2, 1949.

Saved in:
Bibliographic Details
Corporate author / creator:United States. Congress. Senate. Committee on Interior and Insular Affairs.
Imprint:Washington : U.S. G.P.O., 1949.
Description:vii, 954 p. ;
Language:English
Subject:
Format: E-Resource U.S. Federal Government Document Book
URL for this record:http://pi.lib.uchicago.edu/1001/cat/bib/10636703
Hidden Bibliographic Details
Other uniform titles:ProQuest U.S. Congressional Hearings Digital Collection.
Notes:Record is based on bibliographic data in ProQuest Congressional Hearings Digital Collection. Reuse except for individual research requires license from ProQuest, LLC.
Electronic reproduction. [Bethesda, Md.] : ProQuest, 2004. digital, PDF file. ProQuest U.S. Congressional Hearings Digital Collection. Mode of access: World Wide Web via ProQuest website.
Summary:Considers legislation to authorize construction and maintenance of a dam at Bridge Canyon on the Colorado River in Arizona and to grant Congressional consent to the joinder of the U.S. as a party in suits for adjudication of claims to waters of the Colorado River system.
Considers (80) S.J. Res. 145, (80) H.J. Res. 227, (70) H.R. 5773, (81) S. 75, (81) S.J. Res. 4.
Other form:Print version: United States. Congress. Senate. Committee on Interior and Insular Affairs. Central Arizona Project and Colorado River Water Rights
Microfiche version: United States. Congress. Senate. Committee on Interior and Insular Affairs. Central Arizona Project and Colorado River Water Rights. [Bethesda, Md.] : ProQuest,[2004] CIS Hrgs MF Gp 3--(81) S916-7
Govt.docs classification:Y 4.In 8/13:C 71/2

Similar Items