A Candid reply to the full and true answer to the reasons against passing the bill for rebuilding Maismore Bridge, and other purposes therein mentioned. ...
Saved in:
Imprint: | [London? : s.n., 1777] |
---|---|
Description: | 3,[1]p. ; 2⁰. |
Language: | English |
Subject: | |
Format: | E-Resource Book |
URL for this record: | http://pi.lib.uchicago.edu/1001/cat/bib/10265864 |
Notes: | Drop-head title. With a docket title. The bill was introduced on 25 March 1777 and enacted as Public General Acts, 17 Geo.III.c.6. 'Reasons .. why the bill, .. for building the bridge over the river Severn, at Maismore .. should not pass into a law.' was published in the same year. Reproduction of original from Bodleian Library (Oxford). English Short Title Catalog, T198646. Electronic reproduction. Farmington Hills, Mich. : Cengage Gale, 2009. Available via the World Wide Web. Access limited by licensing agreements. |
---|
Similar Items
-
Mr. Smeaton's answer to the misrepresentations of his plan for Black-Friars bridge, contained in a late anonymous pamphlet, addressed to the gentlemen of the committee for building a bridge at Black-Friars.
by: Smeaton, John, 1724-1792
Published: (1760) -
Reasons against building a bridge over the Thames at Putney ...
Published: (1728) -
Reasons against building a bridge over the Thames at Putney ...
Published: (1728) -
Reasons against building a bridge from Lambeth to Westminster : shewing the inconveniencies of the same to the city of London and borough of Southwark ...
Published: (1722) -
Reasons against building a bridge from Lambeth to Westminster shewing the inconveniencies of the same to the city of London and borough of Southwark ...
Published: (1722)